Electric Boom Lift
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Shandong
- Validity to:
Long-term effective
- Last update:
2019-04-30 21:38
- Browse the number:
239
- Jinan PLK Machinery Co.,Ltd By certification [File Integrity]
-
Contact:
qdsenjia(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Shandong
-
Address:
No 6, Huixin Road, Jiyang County, Shandong
- Website: http://www.plklift.com/ http://qdsenjia.szroc.com/
Product details
Electric Boom Lift
It provides a highly flexible solution for working at height. Helps you in the repair and maintenance of wind turbines, tree care and cleaning windows of large buildings. That allow you to work more quickly, easily and safely. The rated load capacity is 200kg. It it enough for worker work with his tools.
SAGA FIRST electric boom lift equipped with chassis of Dongfeng. (Chinese famous brand ). It is the ideal for maintenance and restoration works as well as for plumbing works thanks to the articulation of the arm that allows to overcome obstacles at high height.
Help you to do the long-distance work. To help you work better.
Truck Model |
TLBL-10 |
TLBL-12 |
TLBL-14 |
TLBL-16 |
TLBL-18 |
TLBL-20 |
|
General Data |
Platform Height(m) |
10 |
12 |
14 |
16 |
18 |
20 |
Platform Capacity(kg) |
200 |
200 |
200 |
200 |
200 |
200 |
|
Rotation Speed |
0-2r/min |
1-2r/min |
1-2r/min |
1-2r/min |
1-2r/min |
1-2r/min |
|
Max Hook Height(m) |
6.4 |
7.4 |
8.4 |
9 |
11.5 |
/ |
|
Starting system |
Electric |
Electric |
Electric |
Electric |
Electric |
Electric |
|
Rotation Angle(°) |
360 bothway&continuous |
360 bothway&continuous |
360 bothway&continuous |
360 bothway&continuous |
360 bothway&continuous |
360 bothway&continuous |
|
Hook Capacity(kg) |
1000 |
1000 |
1000 |
1000 |
1000 |
/ |
|
Control Side |
Rotation table/Platform |
Rotation table/Platform |
Rotation table/Platform |
Rotation table/Platform |
Rotation table/Platform |
Rotation table/Platform |
|
Main Dimensions |
Total Weight(kg) |
4495 |
5495 |
5695 |
7490 |
10300 |
11500 |
Curb Weight(kg) |
4365 |
5170 |
5370 |
7295 |
10105 |
11305 |
|
Overall size(mm) |
5995x1960 |
6800×2040 |
7650×2040 |
8400×2310 |
9380×2470 |
9480×2470 |
|
x2980 |
×3150 |
×3170 |
×3510 |
×3800 |
×3860 |
||
Chassis Model |
EQ1041SJ3BDD |
EQ1070DJ3BDF |
EQ1070DJ3BDF |
EQ1080SJ8BDC |
EQ1140LJ9BDF |
EQ1168GLJ4 |
|
Wheel Base(mm) |
2800 |
3308 |
3300 |
3800 |
4700 |
5100 |
|
Engine Data |
Model |
SD4D/D28D11 |
SD4D25R-70 |
SD4D25R/D28D11 |
CY4SK251 |
YC4S170-50 |
ISB190 50 |
Power/Capacity/HP (kw/ml/hp) |
65-85/2433-2771 |
70/2545/95 |
70-85/2575/95-115 |
115/3856/156 |
125/3767 |
140/5900/140 |
|
Emission Standard |
CHINA V Emission Standard |
||||||
Chassis Brand |
Dongfeng |
||||||
Performance Data |
Max Speed (km/h) |
99 |
99 |
99 |
99 |
110 |
90 |
Cab Capacity |
2_5 |
2_5 |
2_5 |
2_5 |
3 |
3 |
|
Axle Quantity |
2 |
2 |
2 |
2 |
2 |
2 |
|
Axle Capacity(kg) |
1800/2695 |
2200/3295 |
2280/3415 |
3000/4490 |
4120/6180 |
4080/7517 |
|
Tire Quantity |
6 |
6 |
6 |
6 |
6 |
6 |
|
Tire Dimensions |
6.50-16/6.50R16 |
7.00R16LT 10PR |
7.00-16/7.00R16 |
7.50R16 |
8.25R20 |
9.00/10.0/275 |
|
Tread(mm) |
Front |
1450 |
1503/1485/1519 |
1503 |
1740 |
1858 |
1880 |
Rear |
1470 |
1494/1516 |
1494 |
1610 |
1806 |
1860 |
|
Overhang length(mm) |
Front |
1215 |
1040 |
1040 |
1130 |
1230 |
1440 |
Rear |
1540 |
1497/1250 |
1497/1250 |
2280 |
2500 |
3100 |
|
Course Angle(°) |
Front |
21 |
20 |
20 |
20 |
18 |
20 |
Rear |
17 |
18 |
18 |
14 |
12.8 |
9 |
http://www.plklift.com/
-
24V Gear Motor
price: Negotiable
-
PVC S Roll
price: Negotiable
-
Oil Immersed Transformer
price: Negotiable
-
Small Plastic Round Flower Pot
price: Negotiable
-
Geared 12V DC Motor
price: Negotiable
-
Off Grid Solar Power
price: Negotiable